Soviana, Widya, Eva Herlina, Sukma Soviati, and Andi Musrian. “Identifikasi Faktor–Faktor Penyebab Cost Overrun Dan Time Overrun Pada Proyek Konstruksi Gedung Di Kota Banda Aceh”. Tameh 11, no. 1 (June 29, 2024): 11–20. Accessed October 8, 2025. https://ojs.unmuha.ac.id/tameh/article/view/83.