The Differences in the Cost of Labor Wage Between the Contract Document and On-site Contractor Cost Analysis: A Case Study
DOI:
https://doi.org/10.37598/jscei.v1i2.001Keywords:
contractor cost analysis, labor coefficient, labor wages, unit price analysis of workAbstract
The growth in the number of construction laborers has been complemented by the magnitude of the value of completed projects, especially in the field of civil construction. Therefore, the construction cost analysis is crucial to improve the efficiency and effectiveness of enhancement activities in this sector. This research paper presents a comparative analysis of labor wage cost between the Unit Price Analysis of Work (UPAW) in comparison to the on-site study of contractor cost calculation. This study analyzed the secondary data of UPAW based on Standar Nasional Indonesia in terms of daily labor productivity and wages of on-site masonry, plastering, and tiling works for a two-floor block school for a 6-day working period in Banda Aceh, Indonesia. The results showed that the yielded area was 1622.31 m2 for the particular block with new averaged labor coefficients ranging between 0.235 to 0.626 (general worker), 0.075 to 0.279 (craftsman), 0.01 (head handyman), and 0.015 (foreman) for on-site works. The calculated labor wage cost for the on-site study was then decreased in comparison to the value stated in the contract. The laborers received less wages (1.10% to 1.25%) for wall masonry, plastering, and tiling work. These cost discrepancies could lead to budget overruns, project delays, and financial losses, affecting the entire success of construction projects.
Downloads
References
Alaloul, Wesam Salah, Muhammad Ali Musarat, M. S. Liew, Abdul Hannan Qureshi, and Ahsen Maqsoom. "Investigating the impact of inflation on labour wages in Construction Industry of Malaysia." Ain Shams Engineering Journal 12, no. 2 (2021). doi: https://doi.org/10.1016/j.asej.2020.08.036
Supriadi, Leni Sagita Riantini, Low Sui Pheng, Leni Sagita Riantini Supriadi, and Low Sui Pheng. "The Indonesian Construction Industry." Business Continuity Management in Construction (2018). doi: https://doi.org/10.1007/987-981-10-5487-7
Mutaqin, Muhammad Iqbal, and Choirul En Huda. "Minimum Wages and Construction Workers Earning in Indonesia." Jurnal Ekonomi dan Kebijakan Publik Indonesia 8.2 (2021): 111-137. doi: https://doi.org/10.24815/ekapi.v8i2.23670
Nor, Saffiah Mohd, Geetha Subramaniam, and Zahariah Sahudin. "The Effects of Foreign Labor on Labor Productivity in Construction Industries." Information Management and Business Review 15.2 (I) SI (2023). doi: https://doi.org/10.22610/imbr.v15i2(I)SI.3426
Hansen, Sen. “Formulating Standard Form of Construction Contract in Indonesia Context.” The 1st International Joint Conference of Indonesia-Malaysia-Bangladesh-Ireland (2015). https://www.researchgate.net/publication/337240644
Standar Nasional Indonesia 1968 (2016). Analisa Harga Satuan. Penerbit Badan Standarisasi Nasional.
Pangestu, Renaldo Pudja, Edison H. Manurung, and Kerlima Hutagaol. "Analysis of the Budget Plan for the Construction of Freja House BSD Mass Buildings using the BOW, SNI 2008 & 2021 AHSP Methods." Indonesian Journal of Applied and Industrial Sciences (ESA) 2, no. 2 (2023). doi: https://doi.10.1007/978-981-10-5487-7-6
Putra, Andi Bayu, and Oki Setyandito. "Analysis on Construction Cost Estimation Ministry Regulation Year 2016 and Year 2022 for Construction Projects." SITEKIN: Jurnal Sains, Teknologi dan Industri (2022). doi: http://dx.doi.org/10.24014/sitekin.v20i2.21790
Piluto, Bambang. "Perbandingan Estimasi Anggaran Biaya Antara Metode BOW, SNI Dan Perhitungan Kontraktor." Jurnal Teknika 12, no. 2 (2020). doi: https://doi.org/10.30736/jt.v13i2.477
Gellu, Cornelius Agatho. "Comparative Study of Unit Price Analysis of Wages, Materials and Equipment on Excurement Work and Head Works Between SNI Method and Field." In ICSET: International Conference on Sustainable Engineering and Technology, vol. 1, no. 1, pp. 36-39. (2022). https://seminar.ustjogja.ac.id/index.php/ICSET/article/view/173
Suhermawan, Dwiky, and Hammam Rofiqi Agustapraja. "Evaluasi Perbandingan Anggaran Biaya Konstruksi Antara Metode SNI Dengan Metode Kontraktor." Jurnal Teknik 21, no. 1 (2023). doi: https://doi.org/10.37031/jt.v21i1.339
Abdullah, Taufik Safii, Suryo Handoyo, and Erni Mulyandari. "Comparative Analysis of Building Cost Budget Plans Using SNI and BOW Methods." Syntax Idea 6, no. 4 (2024). doi: https://doi.org/10.46799/syntax-idea.v6i4.3148
Prianto, Kusnul, and Mega Ayundya Widyastuti. "Analysis of Worker Productivity at Construction Projects in Highlands: A Case Study from the Development of Penanjakan Viewpoint at Bromo Tengger Semeru National Park in East Java." (2022). doi: https://doi.org/10.5220/000890440000481
Trost, Steven M., and Garold D. Oberlender. "Predicting accuracy of early cost estimates using factor analysis and multivariate regression." Journal of construction Engineering and Management 129, no. 2 (2003). doi: https://doi.org/10.1061/(ASCE)0733-9364(2003)129:2(198)
Rauzana, Anita, Abu Hassan Abu Bakar, and Mohamad Nizam Yusof. "The Influence of Uncertainty Variables on Cost Estimation Lesson Learned From Construction Industry in Indonesia." Australian Journal of Basic and Applied Sciences 9, no. 7 (2015). https://www.researchgate.net/publication/309320539
Dikmen, Irem, and M. Talat Birgonul. "A review of international construction research: Ranko Bon's contribution." Construction Management and Economics 24, no. 7 (2006). doi: https://doi.org/10.1080/01446190600601909
Santoso, Lalu Mulyadi, Tiong Iskandar, and Lies Kurniawati Wulandari. "Cost Escalation Analysis on The Western Indonesia National Road Improvement Project (WINRIP)." (2018). http://irjaes.com/wp-content/uploads/2022/04/irjaes-v7n2p128y22.pdf
Harianto, Feri, Mohamad FN Aulady, and Mila K. Wardani. "Productivity of Labor based on Labor Intensive Work for Small Group Contractors in Building Construction Projects in Surabaya, Indonesia." Indian Journal of Science and Technology 11 (2018). doi: https://doi.org/10.17485/ijst/2018/v11i40/131160
Basari, Khubab, Rendra Yoga Pradipta, Jati Utomo Dwi Hatmoko, and Arif Hidayat. "Analisa Koefisien Produktivitas Tenaga Kerja Pada Pekerjaan Pembesian." Jurnal Karya Teknik Sipil 3, no. 4 (2014). https://ejournal3.undip.ac.id/index.php/jkts/article/view/6427
Sukamto, Aulia Qur’anna, Saifoe El Unas, and M. Hamzah Hasyim. "Analisa perbandingan harga satuan pekerjaan beton bertulang berdasarkan SNI dan Software Ms Project." PhD diss., Brawijaya University (2014). https://media.neliti.com/media/publications/119128-ID-analisa-perbandingan-harga-satuan-pekerj.pdf
Sulistyawan, Abriyani. "Analisis kerja lembur dan produktivitas tukang batu pada proyek konstruksi." Jurnal Teknik Sipil, Fakultas Teknik Sipil–Universitas Diponerogo semarang 12, no. 3 (2007). https://www.scribd.com/doc/129396964/analisa-lembur
Lukmanasari, Srie Heruyani Stevia, and Biemo W. Soemardi. "Studi upah dan beban biaya pekerja konstruksi di Indonesia (Studi kasus: Pekerja konstruksi gedung di Pulau Jawa)." Media Komunikasi Teknik Sipil 22, no. 2 (2016). doi: https://doi.org/10.14710/mkts.v22i2.12876
Vamsidhar, K., D. A. Eshwarswaroop, K. Ayyappapreamkrishna, and R. Gopinath. "Study and rate analysis of escalation in construction industry." IOSR Journal of Mechanical and Civil Engineering 11, no. 2 (2014). doi: https://www.researchgate.net/publication/272712831
Badan Pusat Statistik Indonesia. Labor Force Situation in Indonesia (2024). Retrieved from https://www.bps.go.id/en/publication/2024/06/07/112a10c79b8cfa70eec9f6f3/labor-force-situation-in-indonesia-february-2024.html
Downloads
Published
Issue
Section
Categories
License
Copyright (c) 2024 Afizah Ayob (Corresponding Author); Muhammad Ilhamullah, Supriatna (Author/Co-author)

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.